Garden-fresh finds · Free shipping over $65 · Browse the beds

14-23: Structural Modification of a Power Plant’s River Water Intake to Thermal Performance The second phase

SKU: 6123944533

4.6
USD20.00 USD67.00

Pay in 4 interest-free payments of $5.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Nov 11 - Nov 16

Description

The second phase

including compliance field-testing

Factors to be considered will be cycles of concentration and operational load

This may have a significant impact upon the benefits and requirements of existing reuse applications and/or make the previously less attractive projects worth reconsidering

Cooling tower failure can cost an industrial plant thousands of dollars in lost production in a matter of hours

14-23: Structural Modification of a Power Plant’s River Water Intake to Thermal Performance The second phaseA numerical study was conducted to evaluate design alternatives to alleviate ice accumulation at the river intake. A numerical model to predict the ice transport and accumulation at the river intake was developed and validated. The model was used to understand the main phenomenon leading to ice transport and accumulation. This paper will describe the use of the model to analyze the effectiveness of mitigation measures. A mitigation plan consisting of

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products